Site Navigation

Customer Login

Need help logging in?

Did You Know?

Using a garden hose to wash down a driveway or sidewalk can use 25 gallons of water in just 5 minutes. Instead, use a broom to clean sidewalks and driveways.

Invitation To Bid

Goods and Services

Contract # Description Bid Date Deposit
18-201-005 FOR THE DISPOSAL OF SCRAP METAL-CAST IRON 3/8/2018
10:00 AM
No
  BID/CONTRACT DOCUMENTS, MAY BE OBTAINED FROM THE PROCUREMENT OFFICE BOSTON WATER AND SEWER COMMISSION, 980 HARRISON AVENUE, BOSTON, MA 02119, MONDAY THRU FRIDAY 9:00 AM TO 4:30 PM. BID DOCUMENTS WILL BE AVAILABLE ON OR AFTER WEDNESDAY FEBRUARY 21, 2018

Construction Projects

Contract # Description Bid Date Deposit
17-401-002 CONSTRUCTION OF GREEN INFRASTRUCTURE AT DAVID A. ELLIS ELEMANTARY SCHOOL 3/14/2018
10:00 AM
Yes
  The green infrastructure ("GI") designs at the David A. Ellis School focus on capturing and treating stormwater from the paved play area while increasing the safety of the play area for the elementary age students. A large bio retention area, which is the centerpiece of this construction project, along with an enhanced tree trench, will treat storm water from the play area and some of the paved driveway. The enhanced tree trench will also provide a vegetated buffer between the play area and vehicular traffic to increase safety. The overall goal of the GI design is to retain 1-inch of run-off associated with a storm event until it can be infiltrated and/or evapotranspired by the trees and other vegetation. The design also includes several opportunities for monitoring the efficiency of the GI. The engineers ectimate for this contract is approximately $155,000.00. There will ne a non-refundable charge of $25.00 for each set of contract document taken out. Plans will be available on or after Wednesday February 21, 2018.
18-309-009 CLEANING AND INSPECTION OF SEWER AND DRAIN IN HYDE PARK, JAMAICA PLAIN AND ROSLINDALE 3/15/2018
10:00 AM
Yes
  The work in this contract includes the cleaning and video inspection of approximately 30 miles sewer and drain pipes in the City of Boston ranging in size from 6-inch to 36-inch. The engineers ectimate for this contract is approximately $1,100,000.00. There will ne a non-refundable charge of $25.00 for each set of contract document taken out. Plans will be available on or after Wednesday February 21, 2018.
18-309-010 CLEANING AND INSPECTION OF SEWER AND DRAIN IN ROXBURY, SOUTH BOSTON, SOUTH DORCHESTER AND SOUTH END. 3/16/2018
10:00 AM
Yes
  The work in this contract includes the cleaning and video inspection of approximately 30 miles sewer and drain pipes in the City of Boston ranging in size from 6-inch to 36-inch. The engineers ectimate for this contract is approximately $1,100,000.00. There will ne a non-refundable charge of $25.00 for each set of contract document taken out. Plans will be available on or after Wednesday February 21, 2018.

 

Footer