• Click the Select a Neighborhood drop-down box above to change neighborhoods
  • Click on a red or purple shape on the map to view project summary information in a pop-up box
  • Hold down the left mouse button and drag to pan the map
  • Click the plus/minus buttons in the upper left corner to zoom in/out of the map
  • Click the house button in the upper left corner to return to a full view of the city

Detailed Map Instructions/Information:

Project Types

  • The red shapes on the map are street-level projects
  • The purple shapes on the map are featured projects

General

  • Click on a red or purple shape on the map to view project summary information in a pop-up box
  • Then click the More Info (red shapes) or Featured Project Detail Page (purple shapes) link for detailed project information

OR

  • Enter an address in the search box, then click a red or purple shape to view the pop-up box
  • Then click the More Info (red shapes) or Featured Project Detail Page (purple shapes) link for detailed project information

OR

  • Use the Filter By drop-down box below to see summary information for either All, Featured, or Street-Level projects in a neighborhood
  • Then click the View Project Page button for detailed project information 

 

 

Projects (1)

Roxbury Sewer Separation Phase 3 Project

The three-phase Roxbury project involves upgrading our water and sewer systems and installing new storm drains to separate the stormwater flow from the existing combined sewers. Due to the complexity of the project, traffic detours will be implemented during construction.

Project Contacts

Ryan Shea, PE , Acting Director of Construction, 617-989-7447
Yuanzhu Wang, Project Engineer, 617-989-7457
RJV Construction Corp., Project Manager - Matthew DeLuca, 781-831-8036

Overall Schedule

Estimated completion: Spring 2024

Project Completion Status: 50 %